DH-1231 Confirmation of load control

DH-1231 Confirmation of load control

image-20260520-105834.png
Confirmation of load control

Event description

The DSO confirms whether the processing of the load control request has succeeded or failed.

The confirmation includes a reference to the load control request submitted by the load control service provider, enabling the service provider to match the confirmation to the original request in its own system. In addition, the confirmation contains a timestamp field that communicates the time of processing based on the capabilities of the metering system. The purpose of the timestamp is to provide the load control service provider with additional information about the execution of the request without unnecessarily delaying the confirmation message. The description field may be used to provide further details on the reason for a failed execution or to clarify the meaning of the timestamp.

The confirmation always relates to the entire load control request, which in the case of calendar‑based or scheduled control may have contained multiple control periods. Under normal conditions, the DSO programs the request into the remotely controllable meter at the accounting point as soon as possible. In exceptional situations, communication to the meter may be temporarily blocked, causing delays in programming the request. If the service provider has not received the load control confirmation within six hours of sending the load control request, the request must be considered unsuccessful, and it should be resent. If necessary, the service provider should also investigate the cause of the missing confirmation with the DSO.

Parties

  • DSO

  • Datahub

  • Load control service provider

Time limits

Confirmation of load control

Confirmation of load control

The successful or unsuccessful execution of the load control must be confirmed as soon as possible, but no later than within six hours.

Event processing in Datahub

Step

Description

Processing of the load control confirmation

No processing is performed in Datahub based on the content of the load control confirmation. Datahub does not attempt to match the confirmation to a specific control request.  

Information storage

Origin of information

Information stored

Information reported by the party

The information contained in the load control confirmation is not stored in Datahub.

Return of information

Party

Description

Message

Party

Description

Message

DSO

Notification of a forwarded or rejected confirmation.

ACK

Forwarding of information

Party

Description

Message

Party

Description

Message

Load control service provider

An accepted load control confirmation is forwarded to the load control service provider.

DH-1231-2

Event cancellation

A load control confirmation cannot be cancelled. If necessary, a new corrected confirmation must be submitted.

Validation rules

Please see Datahub Validation Rules for a more thorough list.

Rule

Error code

Note

Rule

Error code

Note

The accounting point is found in Datahub and is valid on the reporting date. 

EC.MPT.115

 

The load control service provider must have a valid load control authorisation for the accounting point.

EC.LCR.101

 

The party in the message must be the same as the load control service provider authorised for the accounting point.

EC.LCR.101

 

Please observe that the list is not complete.