DH-129 Accounting point controllability update
Event description
DSO updates the load‑controllability information of the accounting point.
Parties
DSO
Datahub
Important considerations for event handling
If the accounting point is in market‑based load control and the relay configuration of the accounting point changes, for example in connection with a meter replacement, the DSO must, when necessary, inform the service provider directly of the change so that the service provider can target control requests to the correct relay after the change. There is no Datahub event for providing this notification, so the DSO must send the notification directly to the service provider by email. Datahub provides an email template for this notification.
Time limits
Effective time of the update |
|---|
The information update must be reported as soon as the DSO makes the change in its own system. Start of occurrence of the update is either the current day or up to 10 years in the past. |
Event processing in Datahub
Step | Description |
Termination/ cancellation of authorizations | If load controllability is removed from the accounting point (for example in an error‑correction situation), any existing or future load control authorization for the accounting point will be terminated or cancelled. |
Information storage
Origin of information | Information stored |
Information reported by the party | All reported information is stored in the database. |
Information processed by Datahub | Changes to authorizations, if any. |
Return of information
Party | Description | Message |
|---|---|---|
DSO | Notification of a successful or rejected update. |
Forwarding of information
Party | Description | Message |
|---|---|---|
Load control service provider | If load controllability is removed from the accounting point, a notification of the change in authorization is forwarded to those parties whose authorizations were terminated or cancelled. | |
DSO | Notification of termination/cancellation of authorization. |
Significant errors and consequences
Error | Consequence |
|---|---|
Information is reported incorrectly | Suppliers and third parties can make incorrect agreements with a customer. Incorrect meter values in, for example, imbalance settlement or load control. |
Event cancellation
Information is corrected by means of a new update.
Validation rules
Please see Datahub Validation Rules for a more thorough list.
Rule | Error code | Note |
|---|---|---|
The accounting point is found in Datahub and is valid on the reported start of occurrence. | EC.MPT.115 |
|
The accounting point must not have the status ‘Removed from use’ or ‘Deleted’. | EC.MPT.120 |
|
Controllability (a value other than ‘not controllable’) can only be reported for a consumption accounting point. | EC.MPT.193 |
|
The update event must change the controllability information already stored in Datahub on the effective date. | EC.MPT.194 |
|
The reported start of occurrence is midnight. | EC.MPT.107 |
|
The metering grid area is found in Datahub and belongs to the reporting distribution system operator. | EC.MPT.103 |
|
The accounting point is part of the reported metering grid area. | EC.MPT.116 |
|
Please observe that the list is not complete. | ||