DH-129 Accounting point controllability update

DH-129 Accounting point controllability update

image-20260518-120217.png
Accounting point controllability update

Event description

DSO updates the load‑controllability information of the accounting point.

Parties

  • DSO

  • Datahub

Important considerations for event handling

If the accounting point is in market‑based load control and the relay configuration of the accounting point changes, for example in connection with a meter replacement, the DSO must, when necessary, inform the service provider directly of the change so that the service provider can target control requests to the correct relay after the change. There is no Datahub event for providing this notification, so the DSO must send the notification directly to the service provider by email. Datahub provides an email template for this notification. 

Time limits

Effective time of the update

Effective time of the update

The information update must be reported as soon as the DSO makes the change in its own system. Start of occurrence of the update is either the current day or up to 10 years in the past.

Event processing in Datahub

Step

Description

Termination/ cancellation of authorizations

If load controllability is removed from the accounting point (for example in an error‑correction situation), any existing or future load control authorization for the accounting point will be terminated or cancelled.

Information storage

Origin of information

Information stored

Information reported by the party

All reported information is stored in the database.

Information processed by Datahub

Changes to authorizations, if any.

Return of information

Party

Description

Message

Party

Description

Message

DSO

Notification of a successful or rejected update.

ACK

Forwarding of information

Party

Description

Message

Party

Description

Message

Load control service provider

If load controllability is removed from the accounting point, a notification of the change in authorization is forwarded to those parties whose authorizations were terminated or cancelled.

DH-825

DSO

Notification of termination/cancellation of authorization.

DH-1111-1

Significant errors and consequences

Error

Consequence

Error

Consequence

Information is reported incorrectly

Suppliers and third parties can make incorrect agreements with a customer. Incorrect meter values in, for example, imbalance settlement or load control.

Event cancellation

Information is corrected by means of a new update.

Validation rules

Please see Datahub Validation Rules for a more thorough list.

Rule

Error code

Note

Rule

Error code

Note

The accounting point is found in Datahub and is valid on the reported start of occurrence. 

EC.MPT.115

 

The accounting point must not have the status ‘Removed from use’ or ‘Deleted’.

EC.MPT.120

 

Controllability (a value other than ‘not controllable’) can only be reported for a consumption accounting point.

EC.MPT.193

 

The update event must change the controllability information already stored in Datahub on the effective date.

EC.MPT.194

 

The reported start of occurrence is midnight.

EC.MPT.107

 

The metering grid area is found in Datahub and belongs to the reporting distribution system operator.

EC.MPT.103

 

The accounting point is part of the reported metering grid area.

EC.MPT.116

 

Please observe that the list is not complete.