DH-261 Energy community calculation data request (supplier)

DH-261 Energy community calculation data request (supplier)

image-20251016-095313.png
Details of energy community calculation data request

Message DH-261 (energy community calculation data request) is of message type F08.

Message payload includes the following information:

Information field

Level

Necessity

Field content

Note

Information field

Level

Necessity

Field content

Note

Payload

1

1..1

 

 

Request period

2

1..1

 

 

Start time

3

1..1

 

 

End time

3

1..1

 

 

Time step

2

0..1

 

 

Invoice relevant

2

0..1

 

If the ‘Invoice relevant’ element is used in the request, the request must include the ‘Metering point type’ element with the value ‘F01’ (accounting point).

Metering point

2

1..1

 

 

Metering point type

3

0..n

 

If the ‘Invoice relevant’ element is used in the request, the request must include the ‘Metering point type’ element with the value ‘F01’ (accounting point).

Accounting point type

3

0..n

 

If no type is given, both consumption and production accounting points’ data is returned.

Metering point identification

3

0..n

 

Either all metering points based on metering grid area or an individual metering point can be requested.

If the request is carried out for individual metering points, the recommended maximum number of metering points in one search is 1000.

Metering grid area identification

3

0..n

 

Either all metering points based on metering grid area or an individual metering point can be requested.