DH-413 Notification of connection delay
Event description
A DSO reports that an accounting point cannot be connected on the date requested by the supplier.
Parties
DSO
Datahub
Supplier
Time limits
Effective time of the update | Notes/Exceptions |
|---|---|
No later than the business day following the connection date requested by the supplier, if a connection notification (DH-412) has not yet been submitted for the request. | The delay notification is still accepted after this date, but interventions will be made if notifications are repeatedly sent late. |
Return of information
Party | Description | Message |
|---|---|---|
DSO | Notification of successful or rejected notification. |
Forwarding of information
Party | Description | Message |
|---|---|---|
Supplier | The information reported by the DSO is forwarded to the supplier that sent the request. The forwarded notification must contain a reference to the original request. |
Event cancellation
The event cannot be cancelled.
Validation rules
Please see Datahub Validation Rules for a more thorough list.
Rule | Error code | Note |
|---|---|---|
The notified connection time is midnight. | EC.MPT.107 |
|
The accounting point is recorded in Datahub. | EC.MPT.115 |
|
The accounting point must not have the status ‘Removed from use’ or ‘Deleted’. | EC.MPT.120 |
|
The connection date is not in the past. | EC.MPT.125 |
|
The accounting point is in a distribution system operator’s metering grid area. | EC.MPT.130 |
|
The status of the accounting point reported in the message must be ‘Disconnected’. | EC.MPT.143 |
|
If the delay notification is a response to a supplier’s connection request, a connection process must be under way at the accounting point. | EC.MPT.144 |
|
Please observe that the list is not complete. | ||